Seveso Torrent Retention Area

Elements of interest and innovation

  • Recreational and landscape function of the retention basin during periods of time where no flood events occur on the Seveso Torrent
  • Presence of a pond fed with groundwater at the bottom of the retention basin
  • Floating rafts made of modular elements anchored to the concrete bottom with a cable that allows them to rise and fall during the filling and emptying phases of the retention basin are planned to be positioned inside the basin; the rafts are partly characterized by aquatic vegetation for phytoremediation purposes and partly by gravel areas for bird nesting

Other engineering projects

linea m5
M5 Line
File written by Adobe Photoshop¨ 5
M1 line
Immagine1
Extension of the M1 metro line to Baggio - Executive Tender Project
cd895a7c-4000-4429-afff-8870d6a45f63
Redevelopment of the Ex Expo 2015 Area for Human Technopole

The main objective of the project is to create a volume of water retention for the Seveso torrent in order to obtain, in a transitional phase, a better degree of hydraulic safety for the areas frequently affected by the Seveso floods (Niguarda area of the Municipality of Milan); at full capacity, with the completion of the retention projects along the Seveso planned by AIPO, the hydraulic system of the Seveso torrent will reach a degree of safety such as to be able to withstand, without flooding, events with a centennial return time, guaranteeing a hydraulic clearance of 1 meter along the entire city culvert of the Seveso, Martesana and Redefossi system.

The intervention area falls within the Parco Nord of Milan and is characterized by an approximately triangular shape and is bounded to the west by the Bruzzano Cemetery, to the south by via Aldo Moro, and to the north and east by the Seveso torrent. The retention area is completely excavated and therefore no embankments are planned outside the ground level.

The technical data are as follows:

  • Excavation volume: 300.000 m³
  • Reservoir volume: 250.000 m³
  • Area occupied at the bottom: 24.000 m²
  • Total area occupied at ground level: 37.000 m²
  • Maximum water height: 9 m
  • Maximum length: 400 m
  • Maximum width: 200 m

The intervention provides for compensation measures for the work mainly aimed at the redevelopment of areas in close contact with the work, with which they communicate and which will contribute to the enhancement of the Seveso torrent.

Furthermore, the acquisition of over 10 hectares of areas for environmental compensation in the municipalities of Bresso and Cormano in favor of Parco Nord Milano has been planned.

The project involves the creation of a lake fed with first groundwater completed with a perimeter maintenance path, the safeguarding of the surrounding forest which is perimetrated and integrated with new trees on the south side of the lake along Aldo Moro Street.

The lake will maintain the recreational-landscape function for about 320 days a year and will turn into a retention basin during flood events of the Seveso torrent as a controlled retention basin to safeguard the urbanized area.